WOW!!!! What did I start, this started before Christmas as simply repainting the bathroom and replacing toilet that was loose. But then the water would not turn off to toilet so we had to call a plumber to replace the valve and toilet, but he could not do it, because the floor was warped because of water leak. So had to call a person to come and replace floor, but leak had got under vanity. So now I get a new vanity, toilet and floor. EXPENSIVE, but I guess in the long run it would be good, because if the floor had continue leak under the tile it would have got into the front room and hallway. WOW